Horizontal Stabilizer
11 images in this album.
Slideshow (Accesskey 'w') Login (Accesskey 'i')
Gallery: Pix navigate UP Album: Lancair Super ES navigate UP (accesskey 'U')
Jig for orienting, aligning and installing the HS.
Viewed: 1064 times.
HS Installation Jig
Viewed: 921 times.
HS Centerline Location/Alignment to Aircraft Centerline
Viewed: 990 times.
HS Cradle set at 0 degrees by factory in fastbuild. New incidence is -.6 degree. This created gap between cradle and HS @ TE.
Viewed: 1417 times.
HS-to_Cradle gap filled with flox during installation of the HS.
Viewed: 953 times.
Viewed: 925 times.
HS Closeout Weights
Viewed: 955 times.
Checking Hinge Alignment
Viewed: 995 times.
HS Jig
Viewed: 941 times.
HS in Jig
Viewed: 895 times.
Trimming TE for Elevator Fitting
Viewed: 1133 times.
Gallery: Pix navigate UP Album: Lancair Super ES navigate UP (accesskey 'U')
Powered by Jallery v1 RSS