Elevator Construction
16 images in this album.
Slideshow (Accesskey 'w') View comments (Accesskey 'c') Login (Accesskey 'i')
Gallery: Pix navigate UP Album: Lancair Super ES navigate UP (accesskey 'U')
HingeBracket_Alignment_1
Viewed: 1114 times.
HingeWeldment_3
Viewed: 847 times.
HingeWeldment_1
Viewed: 876 times.
HingeWeldment_2
Viewed: 835 times.
Counterweight Casting 1
Note: The notation on the left of the picture is wrong. The counterweights for the elevators were installed after the elevators were closed. See the next photo for the location of the opening and the description.
Viewed: 1008 times.
Counterweight Casting 2: Right counterweight
Viewed: 1052 times.
Counterweight Casting 3
Viewed: 1072 times.
Trimtab_spar_1
Viewed: 923 times.
Trimtab_Hinge_2
Viewed: 803 times.
Trimtab_ActuatorArm_2

Note: We used Carbinge in place of stock aluminum hinge furnished with the kit. Bonded the hinge in with hysol/flox mix and put a small flush rivet at the ends of both halves of the hinge to guard against peeling.
Viewed: 902 times.
Trimtab_ActuatorArm_1
Viewed: 826 times.
Hingepin Tool_1jpg
Viewed: 792 times.
Elevator Closeout_1
Last comment 12/13/02.
Viewed: 904 times.
Elevator-to-HS Fit_1
Last comment 05/18/03.
Viewed: 866 times.
Trimtab Travel 1
Viewed: 849 times.
Trimtab_Travel_2
Viewed: 1128 times.
Gallery: Pix navigate UP Album: Lancair Super ES navigate UP (accesskey 'U')
Powered by Jallery v1 RSS