Elevator Construction
16 images in this album.
Slideshow (Accesskey 'w') View comments (Accesskey 'c') Login (Accesskey 'i')
Gallery: Pix navigate UP Album: Lancair Super ES navigate UP (accesskey 'U')
HingeBracket_Alignment_1
Viewed: 1028 times.
HingeWeldment_3
Viewed: 776 times.
HingeWeldment_1
Viewed: 814 times.
HingeWeldment_2
Viewed: 765 times.
Counterweight Casting 1
Note: The notation on the left of the picture is wrong. The counterweights for the elevators were installed after the elevators were closed. See the next photo for the location of the opening and the description.
Viewed: 942 times.
Counterweight Casting 2: Right counterweight
Viewed: 988 times.
Counterweight Casting 3
Viewed: 1000 times.
Trimtab_spar_1
Viewed: 856 times.
Trimtab_Hinge_2
Viewed: 738 times.
Trimtab_ActuatorArm_2

Note: We used Carbinge in place of stock aluminum hinge furnished with the kit. Bonded the hinge in with hysol/flox mix and put a small flush rivet at the ends of both halves of the hinge to guard against peeling.
Viewed: 839 times.
Trimtab_ActuatorArm_1
Viewed: 748 times.
Hingepin Tool_1jpg
Viewed: 717 times.
Elevator Closeout_1
Last comment 12/13/02.
Viewed: 822 times.
Elevator-to-HS Fit_1
Last comment 05/18/03.
Viewed: 773 times.
Trimtab Travel 1
Viewed: 771 times.
Trimtab_Travel_2
Viewed: 1044 times.
Gallery: Pix navigate UP Album: Lancair Super ES navigate UP (accesskey 'U')
Powered by Jallery v1 RSS