Elevator Construction
16 images in this album.
Slideshow (Accesskey 'w') View comments (Accesskey 'c') Login (Accesskey 'i')
Gallery: Pix navigate UP Album: Lancair Super ES navigate UP (accesskey 'U')
HingeBracket_Alignment_1
Viewed: 1171 times.
HingeWeldment_3
Viewed: 878 times.
HingeWeldment_1
Viewed: 898 times.
HingeWeldment_2
Viewed: 869 times.
Counterweight Casting 1
Note: The notation on the left of the picture is wrong. The counterweights for the elevators were installed after the elevators were closed. See the next photo for the location of the opening and the description.
Viewed: 1035 times.
Counterweight Casting 2: Right counterweight
Viewed: 1077 times.
Counterweight Casting 3
Viewed: 1102 times.
Trimtab_spar_1
Viewed: 945 times.
Trimtab_Hinge_2
Viewed: 830 times.
Trimtab_ActuatorArm_2

Note: We used Carbinge in place of stock aluminum hinge furnished with the kit. Bonded the hinge in with hysol/flox mix and put a small flush rivet at the ends of both halves of the hinge to guard against peeling.
Viewed: 930 times.
Trimtab_ActuatorArm_1
Viewed: 854 times.
Hingepin Tool_1jpg
Viewed: 818 times.
Elevator Closeout_1
Last comment 12/13/02.
Viewed: 939 times.
Elevator-to-HS Fit_1
Last comment 05/18/03.
Viewed: 896 times.
Trimtab Travel 1
Viewed: 875 times.
Trimtab_Travel_2
Viewed: 1156 times.
Gallery: Pix navigate UP Album: Lancair Super ES navigate UP (accesskey 'U')
Powered by Jallery v1 RSS